Plan: areas and quantities
Areas and a bill of quantities, read from your design.
Plan reads a design the way an architect would. Areas names every room with its carpet area and totals each floor. Quantities is a bill of quantities in Indian practice, per floor and in total, worked out on your device with the rules of thumb site engineers use for a first estimate.

Areas
Carpet and built-up
Carpet area is the floor inside the walls; built-up adds the walls to their outside face. Both are shown per room, per floor and for the whole building, in square feet or square metres.
Rooms from the walls
Rooms come from the walls themselves, so homes built with AI, ready-made spaces, blueprint rooms and captured rooms all work.
Rename any room
The name is kept with the design and shows on the floor label, the PDF and the DXF.
A north point
Type the degrees or drag the compass that stands beside the building. The PDF, the DXF and the Vastu checks all follow it.
The bill of quantities
For the total and for each floor:
- Wall area net of openings and wall volume, by construction.
- Bricks, blocks or stone with breakage, and masonry mortar as cement in 50 kg bags and sand.
- Inside and outside plaster, wall putty, primer and two coats of paint.
- Floor tiles over the carpet area with wastage, in boxes, and skirting.
- Ceiling area, doors and windows counted by size, and an RCC slab over each floor with cement, sand, aggregate and steel.
Walls, rates and files
Wall construction
Brick masonry 230 mm or 115 mm, stone, AAC block, concrete block, RCC or drywall, with plaster on both faces, one or none, and a finish.
Every assumption editable
Mixes, thicknesses and wastage can all be changed and are saved with the design.
Your own rates
Rates in rupees stay blank until you type them, then the bill shows amounts and an estimated cost. There are no made-up prices.
CSV and PDF
Download CSV saves the table with the areas, rates and amounts, and the plans PDF ends with an Areas and quantities sheet.
A worked example
One cubic metre of 230 mm brickwork in 1:6 mortar takes off as 500 bricks, about 1.45 bags of cement and 0.30 m³ of sand. These are first estimates for planning, not a replacement for a detailed estimate by an engineer. The bill is an estimate for planning, not a quote, and rates are the indicative figures you type.